| Wind (Operating) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| Big Horn |
WA |
200 MW |
PPM |
|
Completed |
Operating |
Oct 2006 |
| Biglow Canyon |
OR |
126 MW |
PGE, Orion |
|
Completed |
Operating |
Dec 2007 |
| Condon |
OR |
49.8 MW |
SeaWest |
BPA |
Completed |
Operating |
2001 |
| Diamond Willow Wind |
MT |
19.5 MW |
MDU Utilities |
|
|
Operating |
Jan 2008 |
| Elkhorn Wind Power Project |
OR |
101 MW |
Horizon |
Idaho Power |
Completed |
Operating |
Dec 2007 |
| Eurus Combine Hills |
OR |
41.0 MW |
Eurus |
PacifiCorp, ETO |
Completed |
Operating |
Dec 2003 |
| Foote Creek Rim I, II, & IV |
WY |
60 MW |
SeaWest |
PacifiCorp, EWEB, BPA |
Completed |
Operating |
1998 |
| Fossil Gulch |
ID |
10.5 MW |
Exergy |
Idaho Power |
|
Operating |
Jan 2005 |
| Hopkins Ridge |
WA |
150 MW |
RES NA |
PSE |
Completed |
Operating |
Dec 2005 |
| Horseshoe Bend |
MT |
9.0 MW |
Exergy, United Mat. |
Idaho Power |
Completed |
Operating |
Jan 2006 |
| Judith Gap |
MT |
135 MW |
Invenergy |
NorthWestern |
Completed |
Operating |
Dec 2005 |
| Klondike (Phase I) |
OR |
24.0 MW |
Northwestern Wind |
BPA, PPM Energy |
Completed |
Operating |
Dec 2001 |
| Klondike (Phase II) |
OR |
75.0 MW |
PPM |
PGE |
Completed |
Operating |
Oct 2005 |
| Klondike (Phase III) |
OR |
221 MW |
PPM |
PG&E, PSE, EWEB, & others |
Completed |
Operating |
Dec 2007 |
| Leaning Juniper |
OR |
100.5 MW |
PPM |
PacifiCorp |
Completed |
Operating |
Sept 2006 |
| Marengo |
WA |
140 MW |
RES NA |
PacifiCorp |
Completed |
Operating |
Aug 2007 |
| Martinsdale Colony North |
MT |
0.75 MW |
Two Dot Wind LLC |
|
|
Operating |
2005 |
| Martinsdale Colony South |
MT |
2 MW |
Two Dot Wind LLC |
|
|
Operating |
2007 |
| Moe Wind Farm |
MT |
0.45 MW |
Two Dot Wind LLC |
|
|
Operating |
2007 |
| Nine Canyon |
WA |
48.1 MW |
Energy NW, RES |
|
Completed |
Operating |
Sept 2002 |
| Nine Canyon - Phase II |
WA |
15.6 MW |
Energy NW, RES |
|
Completed |
Operating |
Dec 2003 |
| Nine Canyon - Phase III |
WA |
32.2 MW |
Energy NW, RES |
|
Completed |
Operating |
Mar 2008 |
| Rock River |
WY |
50.0 MW |
SeaWest |
PacifiCorp |
Completed |
Operating |
2001 |
| Sheep Valley Ranch |
MT |
0.45 MW |
Two Dot Wind LLC |
|
|
Operating |
2004 |
| Stateline (OR side) |
OR |
123.0 MW |
FPL |
PPM Energy |
Completed |
Operating |
2001 |
| Stateline (WA side) |
WA |
177.0 MW |
FPL |
PPM Energy |
Completed |
Operating |
2001 |
| Vansycle Windplant |
OR |
24.5 MW |
FPL |
PGE |
Completed |
Operating |
1998 |
| White Creek (Last Mile Coop) |
WA |
205 MW |
Last Mile Electric Coop |
Kittitas PUD, Klickitat PUD, BEF, and others |
Completed |
Operating |
Dec 2007 |
| Wild Horse |
WA |
229 MW |
Horizon |
PSE |
Completed |
Operating |
Oct 2006 |
| Wolverine Creek |
ID |
64.5 MW |
Ridgeline, Invenergy |
PacifiCorp |
Completed |
Operating |
Feb 2006 |
| Wind (Development) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| Bennett Creek |
ID |
|
Glenn Ikemoto |
Idaho Power |
|
Under Construction |
N/A |
| Dayton Wind Project |
WA |
|
RES |
PacifiCorp |
Completed |
Under Construction |
N/A |
| Glacier Wind - Phase 1 |
MT |
|
Naturener |
|
|
Under Construction |
N/A |
| Goodnoe Hills |
WA |
|
enXco, Windtricity Ventures |
PacifiCorp |
Completed |
Under Construction |
N/A |
| Hot Springs |
ID |
|
Glenn Ikemoto |
Idaho Power |
|
Under Construction |
N/A |
| Klondike (Phase IIIa) |
OR |
|
PPM Energy |
|
Completed |
Under Construction |
N/A |
| Rattlesnake Rd Wind Phase I |
OR |
|
Horizon Wind |
PG&E, CEP, Confed. Tribes of the Umatilla |
Completed |
Under Construction |
N/A |
| |
| Alkali |
ID |
|
Rick Koebbe |
Idaho Power |
|
Approved |
N/A |
| American Falls |
ID |
|
Ridgeline-Airtricity |
|
Completed |
Approved |
N/A |
| Biglow Canyon (Phases 2 & 3) |
OR |
|
PGE |
|
Completed |
Approved |
N/A |
| Burley Butte |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Echanis Wind Project |
OR |
|
Columbia Energy Partners |
|
Completed |
Approved |
N/A |
| Eurus Combine Hills Phase II |
OR |
|
Eurus |
|
Completed |
Approved |
N/A |
| Golden Valley Wind |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Goshen South |
ID |
|
Ridgeline |
|
|
Approved |
N/A |
| Kittitas Valley (KV) |
WA |
|
Horizon |
|
Completed |
Approved |
N/A |
| Lava Beds Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Leaning Juniper II North |
OR |
|
PPM Energy |
|
Completed |
Approved |
N/A |
| Leaning Juniper II South |
OR |
|
PPM Energy |
|
Completed |
Approved |
N/A |
| Milner Dam Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Notch Butte Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Oregon Trail Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Pebble Springs Wind |
OR |
|
PPM Energy |
Southern California Public Power Authority (SCPPA) |
Completed |
Approved |
N/A |
| Pilgrim Station Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Salmon Falls Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Schwendiman Wind |
ID |
|
Schwendiman |
PacifiCorp |
|
Approved |
N/A |
| Stateline Expansion (1 of 2) |
OR |
|
FPL |
|
Completed |
Approved |
N/A |
| Stateline Expansion (2 of 2) |
OR |
|
FPL |
|
Completed |
Approved |
N/A |
| Thousand Springs Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Tuana Gulch Wind Park |
ID |
|
Exergy |
Idaho Power |
|
Approved |
N/A |
| Vantage Wind Power Project |
WA |
|
Invenergy |
|
Completed |
Approved |
N/A |
| Willow Creek |
OR |
|
Invenergy |
|
Completed |
Approved |
N/A |
| Windland-Shell (Power Co.) |
ID |
|
Windland |
|
Completed |
Approved |
N/A |
| Windy Point |
WA |
|
Windy Point Partners (Cannon) |
|
Completed |
Approved |
N/A |
| |
| Cascade Wind |
OR |
|
First Wind |
|
Underway |
In Permitting Process |
N/A |
| Cassia Gulch Wind Farm |
ID |
|
Cassia Wind/Ikemoto |
Idaho Power, John Deere |
|
In Permitting Process |
N/A |
| Cassia Wind Farm |
ID |
|
Cassia Wind |
Idaho Power, John Deere |
|
In Permitting Process |
N/A |
| Cotterel Mt. |
ID |
|
Windland |
|
Completed |
In Permitting Process |
N/A |
| Desert Claim |
WA |
|
enXco |
|
Completed |
In Permitting Process |
N/A |
| Glenrock Wind Energy Project |
WY |
|
PacifiCorp |
|
|
In Permitting Process |
N/A |
| Golden Hills Wind |
OR |
|
BP Alternative Energy |
|
|
In Permitting Process |
N/A |
| Magic Wind |
ID |
|
Magic Wind LLC, Blue Ribbon Energy LLC |
|
|
In Permitting Process |
N/A |
| Rattlesnake Hills |
WA |
|
Columbia Engy Prt |
|
|
In Permitting Process |
N/A |
| Rolling Hills Wind Energy Project |
WY |
|
PacifiCorp |
|
|
In Permitting Process |
N/A |
| Seven Mile Hill Wind Energy Project |
WY |
|
PacifiCorp |
|
|
In Permitting Process |
N/A |
| Twin Buttes Wind Project |
WA |
|
Avista |
|
|
In Permitting Process |
N/A |
| Valley County Wind Energy Project - Phase I |
MT |
|
Wind Hunter LLC |
|
Underway |
In Permitting Process |
N/A |
| Wild Horse II |
WA |
|
PSE |
|
Completed |
In Permitting Process |
N/A |
| |
| Columbia Wind Ranch |
WA |
|
Cielo |
|
|
Proposed |
N/A |
| Coyote Energy |
MT |
|
|
|
|
Proposed |
N/A |
| Glacier Wind - Phase 2 |
MT |
|
Naturener |
|
|
Proposed |
N/A |
| Judith Gap - Phase II |
MT |
|
|
|
|
Proposed |
N/A |
| Martinsdale - Phase I |
MT |
|
Horizon |
|
|
Proposed |
N/A |
| Montana Marginal |
MT |
|
|
|
|
Proposed |
N/A |
| MT Marginal - Chester |
MT |
|
|
|
|
Proposed |
N/A |
| Sagebrush Capital |
MT |
|
|
|
|
Proposed |
N/A |
| Shepards Flat |
OR |
|
Caithness |
|
Completed |
Proposed |
N/A |
| Teton Ridge - Phase I |
MT |
|
Windpark Solutions |
|
Underway |
Proposed |
N/A |
| Teton Ridge - Phase II |
MT |
|
Windpark Solutions |
|
Underway |
Proposed |
N/A |
| Three Mile Canyon |
OR |
|
Momentum RE |
John Deere |
|
Proposed |
N/A |
| WEST Wind |
MT |
|
|
|
|
Proposed |
N/A |
| Withrow Wind Farm |
WA |
|
Douglas Co PUD |
|
Underway |
Proposed |
N/A |
| Zebuln |
MT |
|
|
|
|
Proposed |
N/A |
| Geothermal (Operating) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| Raft River - Unit 1 |
ID |
15.8 MW |
US Geothermal |
Idaho Power, Ormat |
|
Operating |
Nov 2007 |
| Geothermal (Development) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| |
| Four Mile Hill - Glass Mt. area |
CA |
|
Calpine |
BPA |
Completed |
Approved |
N/A |
| Neal Hot Springs |
OR |
|
US Geothermal |
Idaho Power |
|
Approved |
N/A |
| Newberry Geothermal - Phase 1 |
OR |
|
Davenport Power LLC |
PG&E, US Renewables Group, Riverstone Holdings |
|
Approved |
N/A |
| Telephone Flat - Glass Mt. |
CA |
|
Calpine |
|
Completed |
Approved |
N/A |
| |
| Raft River - Unit 2 |
ID |
|
US Geothermal |
EWEB |
|
In Permitting Process |
N/A |
| Raft River - Unit 3 |
ID |
|
US Geothermal |
Idaho Power |
|
In Permitting Process |
N/A |
| |
| Idaho Falls (Bone area) |
ID |
|
Idatherm |
|
|
Proposed |
N/A |
| OIT Campus |
OR |
|
OIT |
|
|
Proposed |
N/A |
| Soda Springs |
ID |
|
Idatherm |
|
|
Proposed |
N/A |
| Solar (Operating) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| AEC Test Facility |
OR |
25 KW |
AES, EWEB |
ODOE |
|
Operating |
|
| Autohaus |
OR |
12.4 KW |
AES, EWEB |
|
|
Operating |
|
| Brewery Blocks |
OR |
22.4 KW |
Gerding/Edlen |
ETO, BEF |
|
Operating |
2003 |
| Burton Saw and Supply |
OR |
43 KW |
AES, EWEB |
|
|
Operating |
Oct 2007 |
| Capitol Solar Energy Demonstration Project |
WA |
20 KW |
WA Dept of Gen Admin, PSE |
BP, Chelan PUD |
|
Operating |
Jan 2005 |
| Chambers Communication |
OR |
21.6 KW |
AES, Pacific Power |
ETO |
|
Operating |
July 2007 |
| Chase Gardens Medical Center |
OR |
25 KW |
AES, EWEB |
|
|
Operating |
May 2007 |
| Chelan Community Solar (various projects) |
WA |
78 KW |
Chelan PUD |
NW RE Coop, BEF |
|
Operating |
2002 |
| Ellensburg Community Solar Project |
WA |
36 KW |
City of Ellensburg |
BEF, Central Washington University |
|
Operating |
Oct 2006 |
| Encore Ceramics |
OR |
29 KW |
Encore Ceramics, AES |
BEF, ETO |
|
Operating |
Oct 2005 |
| Engelmann Becker Corp. |
OR |
14.8 KW |
AES, EWEB |
|
|
Operating |
|
| Environmental Learning Center |
WA |
23 KW |
WesternSUN |
|
|
Operating |
2002 |
| Euroasian Automotive |
OR |
12.4 KW |
AES, EWEB |
|
|
Operating |
|
| Guaranty RV Luxury Lot |
OR |
22.44 KW |
AES, EPUD |
|
|
Operating |
Dec 2007 |
| Guaranty RV/Camping World |
OR |
61.1 KW |
AES, EPUD |
|
|
Operating |
|
| Industrial Finishes |
OR |
450 KW |
AES, EWEB |
|
|
Operating |
Dec 2007 |
| Jackson Co. Fairgrounds |
OR |
24.75 KW |
Pacific Power |
9 Southern Oregon businesses |
|
Operating |
June 2006 |
| Kettle Foods |
OR |
114 KW |
AES |
ETO, ODOE, Fed Gov, PGE |
|
Operating |
Sept 2003 |
| Kyle Electric |
OR |
24 KW |
AES, Pacific Power |
ETO |
|
Operating |
|
| Lanphier & Associates |
OR |
21.3 KW |
AES, Pacific Power |
ETO |
|
Operating |
|
| Market of Choice |
OR |
31 KW |
AES, EWEB |
|
|
Operating |
Dec 2006 |
| Montana Solar (various projects) |
MT |
94.5 KW |
NorthWestern |
|
|
Operating |
|
| Oak St. Medical |
OR |
14 KW |
AES, EWEB |
|
|
Operating |
|
| Orcas Solar (various projects) |
WA |
97.5 KW |
Orcas P&L |
|
|
Operating |
|
| Pacific Cooperative Bldg |
OR |
25.2 KW |
EWEB, AES |
ODOE |
|
Operating |
Nov 2002 |
| Pendleton Water Treatment |
OR |
100 KW |
Honeywell |
|
|
Operating |
|
| Pepsi Cola of Klamath Falls |
OR |
172 KW |
AES |
ETO, ODOE, 3 Phases, PacifiCorp |
|
Operating |
Dec 2004 |
| Pepsi-Cola Eugene |
OR |
252 KW |
AES, EWEB |
|
|
Operating |
Jan 2008 |
| Puget Sound Electrical JATC |
WA |
16.65 KW |
IBEW, NECA |
BEF, PSE |
|
Operating |
Sept 2004 |
| Rainbow Valley Construction |
OR |
56.78 KW |
AES, EPUD |
|
|
Operating |
Dec 2007 |
| Rays Food Place (Bend) |
OR |
32 KW |
|
C&K Markets, New Path Renew., Christenson El., ODOE, Pacific Power |
|
Operating |
2003 |
| S&B James Construction |
OR |
17.8 KW |
|
|
|
Operating |
|
| Solar Ashland |
OR |
30 KW |
Ashland, BEF |
So. OR Univ., OR Shakespeare Fest, Avista, State of OR |
|
Operating |
2000 |
| Solar Pioneer (Capitol Building) |
OR |
8.4 KW |
ODOE, PGE |
OSEIA, IBEW |
|
Operating |
2002 |
| Sunny Hill Farms |
OR |
11.5 KW |
AES, PGE |
ETO, 3 Phases |
|
Operating |
|
| Sweet Life |
OR |
20 KW |
AES, EWEB |
|
|
Operating |
|
| Tamarack Wellness Center |
OR |
24 KW |
AES, EWEB |
|
|
Operating |
summer 2003 |
| United Bicycle Institute |
OR |
8.4 KW |
|
|
|
Operating |
|
| UO - Erb Memorial Union |
OR |
3 KW |
UO |
EWEB, Ecological Design Center |
|
Operating |
|
| UO - Lillis Business Complex |
OR |
44 KW |
UO |
EWEB |
|
Operating |
|
| UO - Student Recreation Center |
OR |
12 KW |
UO |
EWEB, Ecological Design Center |
|
Operating |
|
| West Wind Forest Products |
OR |
64.8 KW |
AES, EWEB |
|
|
Operating |
June 2006 |
| White Bluffs Solar Station |
WA |
38.7 KW |
Energy NW |
BEF |
|
Operating |
June 2002 |
| Wild Horse Solar Facility |
WA |
500 KW |
EI Solutions |
PSE |
|
Operating |
Oct 2007 |
| Willamett Univ/Kaneko Commons |
OR |
9.8 KW |
AES, PGE |
ETO |
|
Operating |
|
| Solar (Development) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| Arlington Solar Project |
OR |
2000 KW |
Columbia Energy Partners |
PacifiCorp |
|
Proposed |
|
| Medford Reg. Water Reclamation Fac. |
OR |
2000 KW |
SunEnergy Power |
City of Medford |
|
Proposed |
|
| Portland Habilitation Center |
OR |
870 KW |
PHC NW |
US Bancorp Comm Dev Corp, ETO, Meyer Memorila Trust |
|
Under Construction |
|
| Wave/Tidal (Development) |
Project Name |
State |
Capacity |
Developers |
Partners |
Enviro Rvw |
Status |
Startup Date |
| Admiralty Inlet Tidal Energy |
WA |
59-68 MW |
SnoPUD |
|
|
In Permitting Process |
|
| Coos Bay OPT Wave Park |
OR |
100 MW |
OR Wave Energy Prts 1 |
|
|
In Permitting Process |
|
| Coos County Wave Project |
OR |
100 MW |
Finavera Renewables |
|
|
In Permitting Process |
|
| Deception Pass Tidal |
WA |
6.2 MW |
SnoPUD |
|
|
In Permitting Process |
|
| Douglas Co. Wave Project |
OR |
20-180 MW |
Douglas County |
|
|
In Permitting Process |
|
| Florence Wave Park |
OR |
10 MW |
Energetech |
|
|
In Permitting Process |
|
| Guemes Channel Tidal |
WA |
10.9 MW |
SnoPUD |
|
|
In Permitting Process |
|
| Licoln Co Wave Energy Project |
OR |
20-180 MW |
Lincoln Co., OSU |
Central Lincoln PUD, ODOE, USDOE, |
|
In Permitting Process |
|
| Makah Bay demonstration project |
WA |
1 MW |
Finavera Renewables |
Makah Nation, Challam PUD, and others |
Underway |
Approved |
|
| Newport OPT Wave Park |
OR |
100 MW |
OR Wave Energy Prts II |
|
|
In Permitting Process |
|
| Reedsport OPT Wave Park |
OR |
50 MW |
Ocean Power Technologies |
|
|
In Permitting Process |
|
| Rich Passage Tidal |
WA |
4.2 MW |
SnoPUD |
|
|
In Permitting Process |
|
| San Juan Channel |
WA |
16.1 MW |
SnoPUD |
|
|
In Permitting Process | | |